
AI Datacenter Construction Cost Lead
Job description
About Bitdeer
Bitdeer is a world-leading technology company for Bitcoin mining and AI cloud. Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers. Apart from designing industry-leading ASIC chips and manufacturing mining rigs, the Group handles complex processes involved in computing across the value chain. This includes equipment procurement, transport logistics, datacenter design and construction, equipment management, and network and facility operations. Bitdeer also offers advanced cloud capabilities to customers with a high demand for artificial intelligence. Headquartered in Singapore, Bitdeer operates globally with a diversified 3 GW energy portfolio, and deploys Bitcoin mining and HPC datacenters in the United States, Bhutan, Norway, Canada, Malaysia, and Ethiopia. To learn more, visit
We are seeking
We are seeking an AI Datacenter Construction Cost Lead to own cost management and construction procurement across Bitdeer’s AI data center builds. Reporting to the VP, Data Center Construction, you will set budgets, run competitive bids, manage contracts and change orders, and secure long-lead equipment so each project is delivered on budget and on time. You will be the commercial backbone of the construction team, working with site construction managers, the TPM, design, finance, and supply chain. The ideal candidate brings hands-on data center cost engineering and procurement experience and a strong command of construction contracts. Candidates will work on site as needed and should be based in one of the following areas, primarily in Texas and Ohio: Austin, TX; Rockdale, TX; Abilene, TX; Houston, TX; Dallas, TX; Massillon, OH; Clarington, OH; Columbus, OH; Akron, OH; or Pittsburgh, PA. What you will be responsible for
Cost Planning & Control
- Budgets & Estimates: Develop conceptual and detailed estimates, cost plans, and control budgets for each build.
- Cost Reporting: Track committed, incurred, and forecast costs, and own Estimate at Completion (EAC) and cash-flow forecasts.
- Change Control: Review, negotiate, and track change orders, contingency, and allowances with clear documentation.
Procurement & Contracting
- Bid Management: Lead RFPs, bid leveling, and contractor and vendor selection for general contractor, trade, and equipment packages.
- Contract Administration: Prepare and administer construction and supply contracts, GMPs, and purchase orders with legal and finance.
- Long-Lead Equipment: Secure long-lead equipment (e.g., transformers, switchgear, generators, UPS, chillers, CDUs) and manage OFCI scope, delivery, and payment milestones.
Commercial Management
- Pay Applications: Review contractor pay applications, lien waivers, and retention for accuracy and compliance.
- Claims & Disputes: Manage commercial claims and support their resolution.
- Value Engineering: Lead value engineering and benchmarking to lower cost per MW without compromising quality or schedule.
Supplier & Market Strategy
- Supplier Relationships: Build a qualified base of contractors, trade partners, and equipment suppliers across US markets.
- Market Intelligence: Track pricing, lead times, and labor market conditions to inform budgets and procurement strategy.
- Cost Benchmarks: Build a cost database and benchmarks from completed projects.
How you will stand out
- Experience: 8+ years in construction cost management, quantity surveying, or procurement, with significant data center or mission-critical experience.
- Contracts: Strong knowledge of construction contract forms (e.g., AIA, ConsensusDocs) and GMP, lump-sum, and cost-plus models.
- Equipment Procurement: Experience procuring MEP trade packages and long-lead electrical and mechanical equipment.
- Cost Tools: Proficiency with estimating and cost control tools and advanced Excel.
- Education: Bachelor’s degree in Quantity Surveying, Construction Management, Engineering, or a related field, or equivalent experience.
- Certifications: Professional certifications such as RICS, AACE (CCP or CEP), or CPSM.
- Owner-Side Experience: Owner-side cost or procurement role at a hyperscaler, colocation provider, or AI infrastructure developer.
- Commercial Judgment: Protects the company’s position while keeping contractor relationships productive.
- Negotiation: Confident, well-prepared negotiator.
- Analytical Rigor: Builds accurate, auditable cost data.
- Integrity: Runs fair and transparent procurement processes.
What you will experience working with us
- A culture that values authenticity and diverse perspectives.
- An inclusive, respectful environment with open workspaces and an energetic, start-up spirit.
- A fast-growing company with opportunities to network with industry pioneers and enthusiasts.
- The ability to contribute directly and make an impact on the future of the digital asset and AI computing industry.
- Involvement in new projects and in developing processes/systems.
- Personal accountability, autonomy, rapid growth, and learning opportunities.
- Attractive benefits and development such as training and mentoring.
------------------- Bitdeer is committed to providing equal employment opportunities in accordance with country, state, and local laws. Bitdeer does not discriminate against employees or applicants based on conditions such as race, color, gender identity and/or expression, sexual orientation, marital and/or parental status, religion, political opinion, nationality, ethnic background or social origin, social status, disability, age, indigenous status, and union.
Job details
- Published
- November 3, 2026
- Last checked
- November 17, 2026
- Experience
- Lead
- Job source
- breezy
- Workplace
- On-site · Columbus, US
- First seen
- November 3, 2026
LiftmyCV exclusive data
Bitdeer Technologies Group hiring intelligence
Bitdeer Technologies Group currently has 44 active jobs tracked by LiftmyCV. 8 new jobs in the past 7 days.
Verified November 17, 2026
Active openings
44
Currently tracked by LiftmyCV
New in 7 days
8
34 new jobs in the past 30 days
Published salaries
—
Not published by this employer yet
Average opening age
21 days
Across 44 active openings
Workplace breakdown
Hiring countries
Top hiring cities
Most in-demand roles
- • Graduate Talent Trainee
- • 2027 Sales & Business Development Graduate Talent Trainee
- • Admin Executive
- • AI Cloud Platform Product Manager
- • AI Datacenter Construction Cost Lead
- • AI Datacenter Construction Manager
Frequently requested skills
As of November 17, 2026
Hiring insights calculated from active jobs tracked by LiftmyCV.
See how well you match this job
Log in or sign up and Eva will compare your profile with this role, explain your strengths and show what to improve.
Sign up to see your matchAlready have an account? Log inMore at Bitdeer Technologies Group
Similar jobs from this company
Across the market
Similar jobs from other companies
- Construction Manager (Datacenter)Cushman & Wakefield K.K.Tokyo, JPOn-site
- Senior Datacenter Construction ManagerCerebras SystemsFI
- Construction Cost AnalystCumming Management Group, Inc.USOn-site$65,400–$87,200 per year
- Construction Cost AccountantWolverine ConstructionGrand Rapids, USOn-site
- Construction Cost EstimatorGuidehouse Inc.AL, Huntsville, USOn-site
- Specialist, Construction CostSPG Administrative Svcs. Ptr.Indianapolis, INOn-site
Related job searches
Third-party content disclaimer
Full job descriptions are sourced directly from third-party applicant tracking systems (ATS), job boards, recruitment platforms, and employer career pages.
LiftmyCV does not claim ownership of this content or guarantee its accuracy or current availability. All original content is the intellectual property of the respective employers or other rights holders.
LiftmyCV hiring intelligence, availability checks, and related-job recommendations are generated from LiftmyCV data and public sources.
If you prefer, you may apply directly via the original listing for transparency.