LiftmyCVLiftmyCV
ER

Cost Engineer / Earned Value Analyst

Energy Resilience Partners, LLCRemoteProject Controls

Job description

ANMG-PC-002 | Storck Barracks Microgrid | Contingent opportunity

WORK LOCATION: REMOTE/HYBRID - Germany attendance is mandatory at defined milestones. Duty location: Remote with Central European time overlap; scheduled travel to Bavaria, Germany. Minimum Germany presence: Site presence at baseline, major forecast, and change reviews

REQUISITION

ANMG-PC-002

CSS CAM LCAT

640 - Senior Engineer / IT Staff Member (provisional)

DUTY LOCATION

Remote with Central European time overlap; scheduled travel to Bavaria, Germany

WORK ARRANGEMENT

REMOTE/HYBRID - Germany attendance is mandatory at defined milestones

REPORTS TO

ERP Project Manager / designated functional lead

EMPLOYMENT

PROJECT HIRE, PARTNER ASSIGNMENT OR PHASE SPECIALIST

REQUIREMENT BASIS

EXECUTION-DERIVED: ERP management, administration, permitting, procurement, logistics or work-front control role used to deliver the contract.

About ERP and the Project

Energy Resilience Partners, LLC (ERP) is a tribally led federal energy-resilience contractor building the contingent team for the USAG Ansbach - Storck Barracks Smart Microgrid in Bavaria, Germany. The 730-day project integrates two 1 MW diesel generators, 2 MW / 4 MWh battery energy storage, photovoltaic generation, 20 kV medium-voltage distribution, fuel systems, protection, SCADA/microgrid controls, fiber communications, an underground interconnection corridor and full testing, training and commissioning.

Position Summary

Maintains the cost baseline, commitments, accruals, earned value, estimate-at-completion, cash flow, and labor/productivity analytics.

What You Will Do

  • Translate the awarded requirements into controlled scope, WBS, schedule, cost, risk, records, and accountable action owners.
  • Coordinate ERP, Government, RICHARD, P3, JV participants, OEMs, and subcontractors through the authorized reporting and escalation chain.
  • Maintain timely, auditable records and decision-ready weekly/monthly reporting; identify variances before they affect the critical path.
  • Prevent unauthorized commitments, uncontrolled access, superseded information, or unsupported labor/cost charges.
  • Support mobilization, performance, changes, invoicing, acceptance, closeout, and lessons learned.

Minimum Qualifications

  • Relevant degree or equivalent experience and demonstrated performance on federal, EPC, utility, or complex construction programs.
  • Strong written communication, digital systems, records discipline, and ability to coordinate across U.S. and German time zones.
  • Ability to meet the assigned work-location, Germany work-status, installation-access, and information-handling requirements.

Preferred Qualifications

USACE/RMS-CM experience; PMP/PSP/CPCM or role-specific credential; OCONUS/Germany experience.

Germany Work Authorization, Location and Access

  • Selection remains subject to contract qualifications, installation access, employer-of-record and data/system permissions.
  • Remote outside Germany or approved Germany-local/accredited/short-term work status for required site visits.
  • Employer/engagement source must match the approved ERP staffing plan, subcontract chain, independence rules and German employment/work-status requirements.
  • No field work may begin until required Government personnel approval, installation access/badging, safety orientation, role designation/appointment, system/data permissions and work-front release are complete.

Field, Travel and Employment Conditions

  • Work arrangement: REMOTE/HYBRID - Germany attendance is mandatory at defined milestones; minimum presence: Site presence at baseline, major forecast, and change reviews.
  • Project-based and contingent upon award/NTP, funding, final staffing authorization, qualification verification, Government approval where applicable, employer-of-record completion and installation access.
  • Must support approved work hours, outages, testing windows, alternate shifts, weekends or German holidays when the schedule and lawful working-time controls require.
  • Must comply with ERP/prime direction, EM 385-1-1, German safety and labor requirements, quality controls, CUI/FCI and photography/device restrictions, accurate timekeeping and project conduct rules.

Application Materials

  • Resume/CV showing employer, dates, role, project value, technical scope, location, contract/client and specific responsibilities for comparable work.
  • Copies of applicable degrees, licenses, certifications and training records with issuing body and expiration date.
  • Current location, Germany work-authorization/status basis, earliest availability, travel/relocation constraints and required notice period.
  • At least three professional references for comparable work; Government-submitted roles may require additional verification and signed commitment/appointment documentation.

Suggested JazzHR Screening Questions

  • What is your present legal basis to perform the required work in Germany, and will it remain valid through your target assignment period beginning September 8, 2026?
  • Can you meet this work arrangement: REMOTE/HYBRID - Germany attendance is mandatory at defined milestones, including the stated Storck Barracks/Germany attendance?
  • How many years have you performed substantially similar cost engineer / earned value analyst work, and what is the closest project by size, scope and complexity?
  • Identify the degree, license, certification, CQM/safety/trade/OEM credential or system qualification that establishes you meet this posting's minimum requirements.
  • Describe your English proficiency for Government communication and your German proficiency for Host Nation, authority, supplier or field coordination.

Equal opportunity statement: ERP and each approved employing entity make employment decisions without unlawful discrimination. Any tribal, veteran or other preference will be used only when legally authorized and expressly approved for the employing entity and posting.

Job details

Published
August 29, 2026
Job source
jazzhr
Workplace
Remote · Project Controls
First seen
November 21, 2026

LiftmyCV exclusive data

Energy Resilience Partners, LLC hiring intelligence

Energy Resilience Partners, LLC currently has 109 active jobs tracked by LiftmyCV. 29 new jobs in the past 7 days.

Active openings

109

Currently tracked by LiftmyCV

New in 7 days

29

29 new jobs in the past 30 days

Published salaries

—

Not published by this employer yet

Average opening age

58 days

Across 109 active openings

Workplace breakdown

Remote42%
Hybrid0%
On-site58%

Hiring countries

Germany
United States of America
Puerto Rico

Top hiring cities

Illesheim
Independence
Guaynabo
Fort Buchanan
Ansbach
Munich

Most in-demand roles

  • • Deputy Project Manager / Construction Manager
  • • Qualified Fire Protection Engineer (QFPE)
  • • Access, Security, Badging and Mobilization Coordinator
  • • Assistant SSHO / Safety Inspector - Additional Shift Coverage
  • • BESS Installation, Rigging, Mechanical and Civil Crew - Multiple Openings
  • • BESS OEM Integration and Startup Team - Multiple Openings

As of November 21, 2026

Hiring insights calculated from active jobs tracked by LiftmyCV.

AI match explained

See how well you match this job

Log in or sign up and Eva will compare your profile with this role, explain your strengths and show what to improve.

Sign up to see your matchAlready have an account? Log in

More at Energy Resilience Partners, LLC

Similar jobs from this company

Across the market

Similar jobs from other companies

Third-party content disclaimer

Full job descriptions are sourced directly from third-party applicant tracking systems (ATS), job boards, recruitment platforms, and employer career pages.

LiftmyCV does not claim ownership of this content or guarantee its accuracy or current availability. All original content is the intellectual property of the respective employers or other rights holders.

LiftmyCV hiring intelligence, availability checks, and related-job recommendations are generated from LiftmyCV data and public sources.

If you prefer, you may apply directly via the original listing for transparency.