LiftmyCVLiftmyCV

Site Engineering Specialist – Maintenance, Project Execution, Planning and Scheduling

(2510) Sanofi-Aventis Singapore Pte LtdOn-siteSingapore, SG
AI job summary

The Site Engineering Specialist role at Sanofi involves maintaining and ensuring the reliability of process and utility equipment while overseeing project engineering tasks. Responsibilities include planning and scheduling maintenance, managing engineering capital projects, and ensuring compliance with safety and regulatory standards. The role demands a Bachelor's degree in engineering, proficiency in CMMS, and prior experience in a regulated environment. Candidates will engage with cross-functional teams and vendors, driving improvements in processes and systems.

Job description

Job title: Site Engineering Specialist – Maintenance, Project Execution, Planning and Scheduling

  • Location: Singapore

About the Job: Site Engineering Specialist combines maintenance and reliability with project engineering. The role keeps process and utility equipment running reliably through CMMS-driven planning, SOPs, and deviation management, while delivering capital and modification projects from concept to handover (PMR, URS, Change Control, IQ/OQ/PQ).

About Sanofi:

We’re an R&D-driven, AI-powered biopharma company committed to improving people’s lives and delivering compelling growth. Our deep understanding of the immune system – and innovative pipeline – enables us to invent medicines and vaccines that treat and protect millions of people around the world. Together, we chase the miracles of science to improve people’s lives. Key Responsibilities

Maintenance & Reliability

  • Oversee operation, maintenance, planning/scheduling, and performance monitoring of process equipment and utility/facility systems (rotating equipment, pumps, reactors, spray driers, electrical systems, air compressors, chillers, AHUs, cooling towers, water systems, static equipment and related infrastructure)
  • Act as CMMS expert (SAP or equivalent) for planning, scheduling, and tracking preventive and corrective maintenance
  • Coordinate with vendors/contractors for preventive maintenance, servicing, and repair
  • Write, review, and update SOPs for utility and equipment operations
  • Prepare Reliability KPIs and annual utility performance reports
  • Investigate, document, and report deviations/non-conformances; drive CAPA
  • Respond to and troubleshoot equipment/utility breakdowns and emergencies
  • Support sustainability initiatives (energy/water efficiency, emissions reduction, resource optimization)

Project Execution & Engineering Change

  • Coordinate and execute engineering/capital projects from concept through commissioning, handover, and close-out
  • Develop, track, and update project schedules, milestones, and action logs
  • Conduct site inspections to monitor construction, installation, and commissioning against approved plans
  • Prepare and manage Plant Modification Requests (PMR), User Requirement Specifications (URS), and Change Controls
  • Support qualification/validation activities (IQ, OQ, PQ)
  • Prepare project reports, punch lists, commissioning reports, and close-out documentation
  • Support audits, inspections, and regulatory reviews related to projects and equipment modifications

Vendor, Budget & Stakeholder Management

  • Participate in capital and maintenance budget planning
  • Assist in vendor selection, technical evaluations, and bid assessments; monitor vendor/contractor performance
  • Coordinate cross-functional stakeholders, contractors, and consultants
  • Track KPIs for schedule adherence, cost performance, safety, and quality

Compliance & Continuous Improvement

  • Ensure compliance with EHS, regulatory, and internal engineering standards
  • Support implementation of engineering and maintenance best practices
  • Participate in lessons-learned reviews and continuous improvement initiatives

Qualifications & Requirements

Essential

  • Bachelor’s degree in engineering (Electrical and, Instrumentation, Automation, discipline)
  • Experience in maintenance/reliability engineering and/or project engineering within an industrial or regulated environment
  • CMMS proficiency (SAP or equivalent) and understanding of maintenance planning/scheduling
  • Strong written communication skills — SOPs, deviation reports, project reports
  • Ability to manage multiple priorities/projects simultaneously
  • Proficient in Microsoft Office (Word, Excel, PowerPoint, Project); familiarity with BMS is a plus
  • Good analytical, troubleshooting, and problem-solving skills

Preferred

  • Experience in a regulated industry (pharmaceutical, biotech, chemical, or similar GMP/EHS environment)
  • Knowledge of GMP, Change Control, and Validation processes
  • Familiarity with AutoCAD and engineering drawing review
  • Experience managing contractors/vendors in a live operational environment

Key Competencies

  • Strong engineering fundamentals and technical problem-solving
  • Effective stakeholder communication across all organizational levels
  • High accountability, ownership, and attention to detail
  • Ability to work independently and collaboratively across cross-functional teams

Working Conditions

  • Combination of office-based work and regular site activities
  • Occasional work outside regular hours during shutdowns/critical project phases
  • PPE required during site visits, inspections, and construction oversight

Why Choose Us

Join Sanofi as a Site Engineering Specialist

  • Purpose-driven work: You'll keep the equipment and utilities running that directly support the manufacture of medicines and vaccines — your reliability work has a direct line to patient impact.
  • ️ Breadth of ownership: This role spans both maintenance/reliability and project engineering, giving you end-to-end exposure — from day-to-day asset performance to leading capital projects from concept through commissioning.
  • Growth and variety: Work across diverse systems — rotating equipment, utilities, electrical systems, and facility infrastructure — while building skills in GMP, Change Control, and validation (IQ/OQ/PQ).
  • Cross-functional exposure: Regular collaboration with Quality, EHS, Operations, vendors, and project stakeholders builds strong organizational visibility and relationships.
  • Culture of continuous improvement: Be part of lessons-learned reviews and best-practice initiatives that shape how the site operates.
  • ️ Values-led organization: Work guided by Sanofi's values — Aim Higher, Act for Patients, Be Bold, and Lead Together — in a company chasing the miracles of science.

Pursue Progress. Discover Extraordinary. Join Sanofi and step into a new era of science - where your growth can be just as transformative as the work we do. We invest in you to reach further, think faster, and do what’s never-been-done-before. You’ll help push boundaries, challenge convention, and build smarter solutions that reach the communities we serve. Ready to chase the miracles of science and improve people’s lives? Let’s Pursue Progress and Discover Extraordinary – together. At Sanofi, we provide equal opportunities to all regardless of race, color, ancestry, religion, sex, national origin, sexual orientation, age, citizenship, marital status, disability, gender identity, protected veteran status or other characteristics protected by law.

Pursue progress, discover extraordinary

Better is out there. Better medications, better outcomes, better science. But progress doesn’t happen without people – people from different backgrounds, in different locations, doing different roles, all united by one thing: a desire to make miracles happen. So, let’s be those people. At Sanofi, we provide equal opportunities to all regardless of race, colour, ancestry, religion, sex, national origin, sexual orientation, age, citizenship, marital status, ability or gender identity. Watch our ALL IN video and check out our Diversity Equity and Inclusion actions at sanofi.com!

Job details

Published
October 19, 2026
Job source
myworkdayjobs
Workplace
On-site · Singapore, SG
First seen
October 19, 2026

Skills mentioned in this job

CMMSSAPMicrosoft OfficeAutoCADGMP

LiftmyCV exclusive data

(2510) Sanofi-Aventis Singapore Pte Ltd hiring intelligence

(2510) Sanofi-Aventis Singapore Pte Ltd currently has 1 active jobs tracked by LiftmyCV. 1 new jobs in the past 7 days.

Active openings

1

Currently tracked by LiftmyCV

New in 7 days

1

1 new jobs in the past 30 days

Published salaries

—

Not published by this employer yet

Average opening age

2 days

Across 1 active opening

Workplace breakdown

Remote0%
Hybrid0%
On-site100%

Hiring countries

Singapore

Most in-demand roles

  • • Logistics Lead (Thailand, Malaysia & Singapore)

As of November 17, 2026

Hiring insights calculated from active jobs tracked by LiftmyCV.

AI match explained

See how well you match this job

Log in or sign up and Eva will compare your profile with this role, explain your strengths and show what to improve.

Sign up to see your matchAlready have an account? Log in

More at (2510) Sanofi-Aventis Singapore Pte Ltd

Similar jobs from this company

Across the market

Similar jobs from other companies

Related job searches

Third-party content disclaimer

Full job descriptions are sourced directly from third-party applicant tracking systems (ATS), job boards, recruitment platforms, and employer career pages.

LiftmyCV does not claim ownership of this content or guarantee its accuracy or current availability. All original content is the intellectual property of the respective employers or other rights holders.

LiftmyCV hiring intelligence, availability checks, and related-job recommendations are generated from LiftmyCV data and public sources.

If you prefer, you may apply directly via the original listing for transparency.