LiftmyCVLiftmyCV

TFO Field Project Manager - Data Center Construction

KALCONOn-siteRichmond, US

Job description

KALCON is seeking an experienced TFO Field Project Manager (Owner’s Representative) to provide on-site leadership and owner representation during the tenant fit-out of mission-critical data center facilities. This role is heavily field-focused and responsible for overseeing construction execution, safety, schedule performance, quality assurance, commissioning activities, logistics coordination, and integration between base building and tenant improvement work. The ideal candidate is a proactive construction professional with data center, critical facilities, semiconductor, or similar complex project experience who can effectively manage contractors, drive accountability, resolve field challenges, and ensure projects are delivered safely, on schedule, within budget, and in alignment with the owner’s objectives. This position requires a strong understanding of construction means and methods, commissioning processes, MEP systems, and fast-paced project environments where daily field presence and hands-on leadership are essential.

Minimum Qualifications:

  • Bachelor's degree in construction management or engineering, or applicable trade/superintendent experience.
  • 7-10 years of experience working in either design or construction of projects. Experience in Labs, Semiconductor, Data Center, and/or Critical Facility Construction is necessary.
  • Proficient use of MS-Word, Excel, PowerPoint, Project
  • Strong written and oral communication skills to exchange information with senior management, service providers, workers, and contractors

Tasks and Responsibilities:

Field Management Focused

  • Safety Oversight
  • Schedule Oversight - Day-to-Day Tracking/Management
  • Owner/GC Coordination: Base Build GC vs. Fit-Out GC
  • MOP Coordination
  • Delivery Coordination
  • Site Logistics Coordination
  • QA/QC
  • Diving Into Plans/Specs - Understand Design Intent/Scope/Etc.
  • Ensuring GC is Executing QA/QC Plan (Project Specific)
  • Tenant Fit-Out Experience: Fast Paced Schedule
  • Busway/RPP's, Hot Aisle Containment, Conveyance, Etc.
  • Existing Buildings Retrofits: Added CRAH's, Power/Cooling, PQM Retrofit, Etc.
  • Commissioning
  • Submittals, RFI's, Procurement Log
  • Other Items:
  • OFCI Tracking
  • OAC Meetings
  • GC Weekly Reports, Safety Metrics
  • Must be on the job 5 day a week 6:30-3:30

Other Responsibilities (secondary):

  • Design Management
  • Budget/Cost
  • Change Management
  • Pay Apps

Schedule:

  • Review construction manager's (CM) monthly forecast.
  • Hold weekly CPM schedule review meetings
  • Attend multiple CM/subcontractor detailed planning meetings
  • Owner Furnished Contractor Installed (OFCI) equipment schedule management
  • Vendor start up scheduling
  • Commissioning schedule coordination
  • Owner/Direct vendor schedule management (IT, Roofing Consultant, Geotech, Third Party Inspectors)
  • Customer Fitout - schedule management
  • Customer Fitout - Phase turn over alignment (base build & Tenant)

Cost:

  • GMP buyout review and support
  • GMP buyout detailed analysis and ownership of recommendations
  • Provide VE recommendations with analysis
  • Change order review and approval (cost approval and process flow)
  • Proactive cost avoidance/reduction ideas
  • Monthly pay application review

Field:

  • QA/QC general oversight
  • QA/QC daily review and inspection with CM
  • Safety general oversight
  • Safety daily review & inspection with CM
  • facility coordination (MOP's, Notifications)
  • Assess weekly progress and provide accurate reporting
  • Manage OFCI equipment inspection/receiving process

Project Management:

  • Process cost documents (pay apps, change orders, etc.)
  • Manage and attend weekly OAC meetings and minutes
  • Provide weekly project reporting
  • Manage project closeout process (financial, O&M's, punchlist, Ops, etc.)

Design:

  • After initial design, manage design coordination efforts
  • Coordinate customer fit out design package integration (non base-build)
  • Validate design cost and process changes
  • Management of construction administration process

Permit/AHJ:

  • Manage and communicate overall permit process
  • AHJ inspection and certificate of occupancy process management.

Benefits Offered:

  • Medical insurance
  • Dental Insurance
  • Vision Insurance
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid National Holidays
  • Reimbursement for professional licenses and certifications

Submission Requirements:

At a minimum, the candidate's professional resume must include the following:

  • List of all Educational Achievements
  • List of all Professional Licenses or Certificates
  • List of Awards Received
  • Detailed Employment History with each company

o Name of the firm or agency o Start Date and End Date (Month & Year) o Positions Held o List of Projects/Programs Managed including project value, location of assignment, roles and responsibilities and contribution to each project At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all. Salary Range $140,000—$220,000 USD

Job details

Published
October 30, 2026
Last checked
November 17, 2026
Job source
greenhouse
Workplace
On-site · Richmond, US
First seen
October 31, 2026

LiftmyCV exclusive data

KALCON hiring intelligence

KALCON currently has 6 active jobs tracked by LiftmyCV. 2 new jobs in the past 7 days.

Verified November 17, 2026

Active openings

6

Currently tracked by LiftmyCV

New in 7 days

2

6 new jobs in the past 30 days

Published salaries

17%

Median disclosed salary: $187,500

Average opening age

13 days

Across 6 active openings

Workplace breakdown

Remote0%
Hybrid0%
On-site100%

Hiring countries

United States of America

Top hiring cities

Richmond
Brookfield
Cedar Rapids
San Antonio
Shippingport

Most in-demand roles

  • • Civil Draftsperson - Design Build
  • • Commissioning Manager - Data Center Construction
  • • MEP Construction Manager - Data Center Construction
  • • MEP Delivery Manager - Data Center Construction
  • • TFO Field Project Manager - Data Center Construction
  • • TFO Project Manager - Data Center Construction

Frequently requested skills

Construction Management
Excel
MS Word
PMP
PowerPoint
Project Management

Median disclosed salary: $187,500 · 17% of jobs publish a salary

As of November 18, 2026

Hiring insights calculated from active jobs tracked by LiftmyCV.

AI match explained

See how well you match this job

Log in or sign up and Eva will compare your profile with this role, explain your strengths and show what to improve.

Sign up to see your matchAlready have an account? Log in

More at KALCON

Similar jobs from this company

Across the market

Similar jobs from other companies

Related job searches

Third-party content disclaimer

Full job descriptions are sourced directly from third-party applicant tracking systems (ATS), job boards, recruitment platforms, and employer career pages.

LiftmyCV does not claim ownership of this content or guarantee its accuracy or current availability. All original content is the intellectual property of the respective employers or other rights holders.

LiftmyCV hiring intelligence, availability checks, and related-job recommendations are generated from LiftmyCV data and public sources.

If you prefer, you may apply directly via the original listing for transparency.