
Wastewater Construction Manager (Data Center Construction) – Texas
Job description
WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.
About the Role
WORLD WIDE PROFESSIONAL SOLUTIONS is hiring a Wastewater Construction Manager to support hyperscale data center builds across North Texas. This role sits within the owner’s representative construction management team and is focused on field execution, installation oversight, and delivery of water and wastewater systems supporting mission critical facilities. This is a full-time, long-term position with continuity across multiple projects. You will be embedded in active builds, driving execution quality, schedule adherence, and system readiness in a zero downtime environment.
Role Overview
The Wastewater Construction Manager is responsible for on-site construction execution and coordination of wastewater and water infrastructure systems. This is a field leadership role, ensuring systems are installed correctly, safely, and in alignment with design, schedule, and commissioning requirements. You will work closely with contractors, trades, engineers, and client stakeholders to drive installation progress, resolve field issues, and support turnover readiness.
Key Responsibilities – Construction Execution (Water / Wastewater)
- Act as the owner’s representative field lead for wastewater and water systems
- Oversee daily construction activities and installation of:
- Wastewater treatment systems
- Industrial water handling and discharge systems
- Process piping and utility infrastructure
- Monitor contractor performance, manpower, and sequencing to maintain schedule
- Perform regular site walkdowns to verify installation quality and identify issues early
- Enforce compliance with drawings, specifications, and construction standards
- Coordinate across trades to resolve clashes, access constraints, and install conflicts
- Drive execution of RFIs, submittals, and field clarifications
- Support QA/QC including inspections, testing, and punchlist management
- Partner with commissioning teams for startup, flushing, testing, and turnover
- Track progress, maintain documentation, and report field issues
- Promote a safety-first, high accountability jobsite culture
- Mentor junior staff and reinforce field best practices
Requirements
- 5 to 10 years of construction management or field supervision experience in:
- Data centers
- Industrial water or wastewater systems
- Advanced manufacturing
- Oil and gas or heavy industrial environments
- Strong background in field execution, sequencing, and trade coordination
- Experience with process piping, utility systems, or industrial infrastructure
- Ability to operate in fast-paced, schedule-driven environments
- Working knowledge of water and wastewater codes and standards
- Proficiency with construction documentation and reporting tools
Preferred Experience
- Hyperscale data center or mission critical project experience
- Exposure to commissioning, startup, and turnover
- Experience in an owner’s representative environment
- OSHA 30 or equivalent certification
- Multi-site or large program experience
Education
- Bachelor’s degree in Construction Management, Engineering, or related field preferred
- Equivalent field experience will be considered
What Sets This Role Apart
- Full-time role with WWPS. Not a contract
- Long-term pipeline across multiple hyperscale data center builds
- Field-focused position with direct impact on execution and delivery
- Exposure to large-scale, technically complex infrastructure
- Competitive compensation, full benefits, and career growth
About the Role
WORLD WIDE PROFESSIONAL SOLUTIONS is hiring a Wastewater Construction Manager to support hyperscale data center builds across North Texas. This role sits within the owner’s representative construction management team and is focused on field execution, installation oversight, and delivery of water and wastewater systems supporting mission critical facilities. This is a full-time, long-term position with continuity across multiple projects. You will be embedded in active builds, driving execution quality, schedule adherence, and system readiness in a zero downtime environment.
Role Overview
The Wastewater Construction Manager is responsible for on-site construction execution and coordination of wastewater and water infrastructure systems. This is a field leadership role, ensuring systems are installed correctly, safely, and in alignment with design, schedule, and commissioning requirements. You will work closely with contractors, trades, engineers, and client stakeholders to drive installation progress, resolve field issues, and support turnover readiness.
Key Responsibilities – Construction Execution (Water / Wastewater)
- Act as the owner’s representative field lead for wastewater and water systems
- Oversee daily construction activities and installation of:
- Wastewater treatment systems
- Industrial water handling and discharge systems
- Process piping and utility infrastructure
- Monitor contractor performance, manpower, and sequencing to maintain schedule
- Perform regular site walkdowns to verify installation quality and identify issues early
- Enforce compliance with drawings, specifications, and construction standards
- Coordinate across trades to resolve clashes, access constraints, and install conflicts
- Drive execution of RFIs, submittals, and field clarifications
- Support QA/QC including inspections, testing, and punchlist management
- Partner with commissioning teams for startup, flushing, testing, and turnover
- Track progress, maintain documentation, and report field issues
- Promote a safety-first, high accountability jobsite culture
- Mentor junior staff and reinforce field best practices
Requirements
- 5 to 10 years of construction management or field supervision experience in:
- Data centers
- Industrial water or wastewater systems
- Advanced manufacturing
- Oil and gas or heavy industrial environments
- Strong background in field execution, sequencing, and trade coordination
- Experience with process piping, utility systems, or industrial infrastructure
- Ability to operate in fast-paced, schedule-driven environments
- Working knowledge of water and wastewater codes and standards
- Proficiency with construction documentation and reporting tools
Preferred Experience
- Hyperscale data center or mission critical project experience
- Exposure to commissioning, startup, and turnover
- Experience in an owner’s representative environment
- OSHA 30 or equivalent certification
- Multi-site or large program experience
Education
- Bachelor’s degree in Construction Management, Engineering, or related field preferred
- Equivalent field experience will be considered
What Sets This Role Apart
- Full-time role with WWPS. Not a contract
- Long-term pipeline across multiple hyperscale data center builds
- Field-focused position with direct impact on execution and delivery
- Exposure to large-scale, technically complex infrastructure
- Competitive compensation, full benefits, and career growth
This is a full-time position for World Wide Professional Solutions. We offer excellent benefits including medical, dental, vision, life, short term disability, long term disability, and a company match retirement plan. All benefits begin the first of the month following your start date. World Wide Professional Solutions provides equal employment opportunities to all employees and applicants for employment and prohibits discrimination and harassment of any type without regard to race, color, religion, age, sex, national origin, disability status, genetics, protected veteran status, sexual orientation, gender identity or expression, or any other characteristic protected by federal, state or local laws.
Job details
- Published
- April 23, 2026
- Last checked
- November 17, 2026
- Job source
- lever
- Workplace
- On-site · Vernon, US
- First seen
- October 21, 2026
LiftmyCV exclusive data
World Wide Professional Solutions hiring intelligence
World Wide Professional Solutions currently has 13 active jobs tracked by LiftmyCV. 6 new jobs in the past 7 days.
Verified November 17, 2026
Active openings
13
Currently tracked by LiftmyCV
New in 7 days
6
7 new jobs in the past 30 days
Published salaries
—
Not published by this employer yet
Average opening age
57 days
Across 13 active openings
Workplace breakdown
Hiring countries
Top hiring cities
Most in-demand roles
- • Base Build PMO Executive, North Phoenix, AZ - Semiconductor
- • Director of Semiconductor Base Build, North Phoenix, AZ
- • Director of Semiconductor Tool Install
- • Electrical Construction Coordinator
- • Process Piping QA/QC Inspector
- • Project Administrative Coordinator
Frequently requested skills
As of November 17, 2026
Hiring insights calculated from active jobs tracked by LiftmyCV.
See how well you match this job
Log in or sign up and Eva will compare your profile with this role, explain your strengths and show what to improve.
Sign up to see your matchAlready have an account? Log inVisa sponsorship insights
Sponsorship not specified for this role
This job posting does not state whether visa sponsorship is available.
Employer H-1B filing history
World Wide Professional Solutions, LLC
2
certified
FY 2026
latest data
Based on U.S. Department of Labor LCA disclosure data. LCA certification is not the same as visa petition approval, and historical activity does not guarantee sponsorship for this role.
More at World Wide Professional Solutions
Similar jobs from this company
- Wastewater Treatment Project Manager (Data Center Construction) – TexasWorld Wide Professional SolutionsVernon, USOn-site
- Electrical Construction CoordinatorWorld Wide Professional SolutionsPeoria, USOn-site
- Site Logistics Project Manager, Vernon, TX - Data Center ConstructionWorld Wide Professional SolutionsVernon, USOn-site
- Regional Data Center Construction ExecutiveWorld Wide Professional SolutionsRemoteRemote
Across the market
Similar jobs from other companies
- Texas Water/Wastewater LeaderOlssonDallas, USOn-site
- Texas Water/Wastewater Market DirectorAtkinsRealis USA Inc.Houston, USOn-site$150,000–$235,000 per year
- Estimator - Water/Wastewater ConstructionMaple ReindersCalgary, CAHybrid$105,000–$155,000 per year
- Construction Manager - Water/WastewaterAECOMDallas, TXOn-site
- Construction Executive (Water / Wastewater)Clark Water, LLCAtlanta, GAOn-site
- Construction Manager - Water/WastewaterPape-Dawson Consulting Engineers, LLCPlano, USOn-site
Third-party content disclaimer
Full job descriptions are sourced directly from third-party applicant tracking systems (ATS), job boards, recruitment platforms, and employer career pages.
LiftmyCV does not claim ownership of this content or guarantee its accuracy or current availability. All original content is the intellectual property of the respective employers or other rights holders.
LiftmyCV hiring intelligence, availability checks, and related-job recommendations are generated from LiftmyCV data and public sources.
If you prefer, you may apply directly via the original listing for transparency.