
Wastewater Treatment Project Manager (Data Center Construction) – Texas
Job description
WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.
About the Role
WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization focused on delivering high-impact construction execution through lean practices, collaborative delivery, and performance-driven outcomes. We are hiring a Wastewater Treatment Project Manager to support multiple hyperscale data center projects across North Texas. This role sits within our owner’s representative construction management team, overseeing critical process utility infrastructure tied to water and wastewater systems. This is a full-time, long-term position with WWPS, not a contract or staff augmentation role. You will be embedded in major mission critical builds with continuity across projects, full benefits, and long-term career stability. We are actively hiring for immediate project needs across multiple Texas sites and are structured to support both traveling and relocating candidates. Per-dem and travel packages are available, and we also offer relocation assistance for candidates seeking long-term placement. This is an opportunity to step into a stable, long-term role with consistent project continuity, rather than short-term contract work. If you are looking for sustained engagement on large-scale, mission critical builds with a clear path forward, this role is built for that.
Role Overview
The Wastewater Treatment Project Manager is responsible for planning, coordinating, and overseeing the installation, commissioning, and turnover of water and wastewater infrastructure systems supporting hyperscale data center operations. This role ensures systems are delivered on schedule, fully compliant, and aligned with mission critical performance standards, including reliability, maintainability, and environmental compliance. You will operate in a fast-paced, zero downtime tolerance environment where execution quality and schedule adherence are critical to overall project success.
Key Responsibilities – Process Utility Systems (Water / Wastewater)
- Serve as the owner’s representative discipline lead for wastewater and water infrastructure systems across multiple active data center sites
- Oversee installation and execution of: Wastewater treatment systems, Industrial water handling and discharge systems, Cooling water support infrastructure as applicable
- Validate contractor scope, installation methods, and system compliance with approved drawings and specifications
- Lead coordination between contractors, design teams, and client stakeholders to resolve field issues quickly and effectively
- Drive design reviews, RFIs, submittals, and field clarifications related to process utility systems
- Perform regular site walkdowns to verify installation quality, identify deviations, and enforce construction standards
- Support QA/QC execution including inspection plans, testing procedures, and system validation
- Participate in commissioning, turnover, and startup activities to ensure systems meet operational readiness requirements
- Maintain accurate documentation including issue tracking, test records, and progress reporting
- Contribute to a commissioning-driven culture with strong focus on system performance and reliability
- Mentor junior staff and reinforce best practices across project teams
Requirements
- 5 to 8 years of construction experience in one or more of the following: Data centers, Industrial water or wastewater systems, Advanced manufacturing, Oil and gas or heavy industrial environments
- Experience supporting process utility systems, water infrastructure, or industrial piping systems
- Strong understanding of construction execution, sequencing, and coordination in complex environments
- Ability to operate in schedule-critical, fast-paced project environments
- Working knowledge of applicable codes and standards related to water and wastewater systems
- Proficiency with Microsoft Office and standard construction documentation platforms
Preferred Experience
- Experience on hyperscale or mission critical projects
- Exposure to commissioning and startup of utility systems
- Familiarity with owner’s representative or client-side project delivery models
- OSHA 30 or equivalent safety certification
- Experience working across multiple sites or large-scale programs
Education
- Bachelor’s degree in Construction Management, Engineering, or related field preferred
- Equivalent field experience will be considered
What Sets This Role Apart
- Full-time employment with WWPS. Not a contract role
- Long-term project pipeline across multiple hyperscale data center builds
- Opportunity to work within an owner’s representative structure, influencing outcomes rather than just executing scope
- Exposure to large-scale, technically complex, mission critical infrastructure
- Competitive compensation, full benefits, and career progression
Equal Opportunity
World Wide Professional Solutions provides equal employment opportunities to all employees and applicants and prohibits discrimination and harassment of any type in accordance with applicable laws.
About the Role
WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization focused on delivering high-impact construction execution through lean practices, collaborative delivery, and performance-driven outcomes. We are hiring a Wastewater Treatment Project Manager to support multiple hyperscale data center projects across North Texas. This role sits within our owner’s representative construction management team, overseeing critical process utility infrastructure tied to water and wastewater systems. This is a full-time, long-term position with WWPS, not a contract or staff augmentation role. You will be embedded in major mission critical builds with continuity across projects, full benefits, and long-term career stability. We are actively hiring for immediate project needs across multiple Texas sites and are structured to support both traveling and relocating candidates. Per-dem and travel packages are available, and we also offer relocation assistance for candidates seeking long-term placement. This is an opportunity to step into a stable, long-term role with consistent project continuity, rather than short-term contract work. If you are looking for sustained engagement on large-scale, mission critical builds with a clear path forward, this role is built for that.
Role Overview
The Wastewater Treatment Project Manager is responsible for planning, coordinating, and overseeing the installation, commissioning, and turnover of water and wastewater infrastructure systems supporting hyperscale data center operations. This role ensures systems are delivered on schedule, fully compliant, and aligned with mission critical performance standards, including reliability, maintainability, and environmental compliance. You will operate in a fast-paced, zero downtime tolerance environment where execution quality and schedule adherence are critical to overall project success.
Key Responsibilities – Process Utility Systems (Water / Wastewater)
- Serve as the owner’s representative discipline lead for wastewater and water infrastructure systems across multiple active data center sites
- Oversee installation and execution of: Wastewater treatment systems, Industrial water handling and discharge systems, Cooling water support infrastructure as applicable
- Validate contractor scope, installation methods, and system compliance with approved drawings and specifications
- Lead coordination between contractors, design teams, and client stakeholders to resolve field issues quickly and effectively
- Drive design reviews, RFIs, submittals, and field clarifications related to process utility systems
- Perform regular site walkdowns to verify installation quality, identify deviations, and enforce construction standards
- Support QA/QC execution including inspection plans, testing procedures, and system validation
- Participate in commissioning, turnover, and startup activities to ensure systems meet operational readiness requirements
- Maintain accurate documentation including issue tracking, test records, and progress reporting
- Contribute to a commissioning-driven culture with strong focus on system performance and reliability
- Mentor junior staff and reinforce best practices across project teams
Requirements
- 5 to 8 years of construction experience in one or more of the following: Data centers, Industrial water or wastewater systems, Advanced manufacturing, Oil and gas or heavy industrial environments
- Experience supporting process utility systems, water infrastructure, or industrial piping systems
- Strong understanding of construction execution, sequencing, and coordination in complex environments
- Ability to operate in schedule-critical, fast-paced project environments
- Working knowledge of applicable codes and standards related to water and wastewater systems
- Proficiency with Microsoft Office and standard construction documentation platforms
Preferred Experience
- Experience on hyperscale or mission critical projects
- Exposure to commissioning and startup of utility systems
- Familiarity with owner’s representative or client-side project delivery models
- OSHA 30 or equivalent safety certification
- Experience working across multiple sites or large-scale programs
Education
- Bachelor’s degree in Construction Management, Engineering, or related field preferred
- Equivalent field experience will be considered
What Sets This Role Apart
- Full-time employment with WWPS. Not a contract role
- Long-term project pipeline across multiple hyperscale data center builds
- Opportunity to work within an owner’s representative structure, influencing outcomes rather than just executing scope
- Exposure to large-scale, technically complex, mission critical infrastructure
- Competitive compensation, full benefits, and career progression
Equal Opportunity
World Wide Professional Solutions provides equal employment opportunities to all employees and applicants and prohibits discrimination and harassment of any type in accordance with applicable laws. This is a full-time position for World Wide Professional Solutions. We offer excellent benefits including medical, dental, vision, life, short term disability, long term disability, and a company match retirement plan. All benefits begin the first of the month following your start date. World Wide Professional Solutions provides equal employment opportunities to all employees and applicants for employment and prohibits discrimination and harassment of any type without regard to race, color, religion, age, sex, national origin, disability status, genetics, protected veteran status, sexual orientation, gender identity or expression, or any other characteristic protected by federal, state or local laws.
Job details
- Published
- April 23, 2026
- Last checked
- November 17, 2026
- Job source
- lever
- Workplace
- On-site · Vernon, US
- First seen
- October 21, 2026
LiftmyCV exclusive data
World Wide Professional Solutions hiring intelligence
World Wide Professional Solutions currently has 13 active jobs tracked by LiftmyCV. 6 new jobs in the past 7 days.
Verified November 17, 2026
Active openings
13
Currently tracked by LiftmyCV
New in 7 days
6
7 new jobs in the past 30 days
Published salaries
—
Not published by this employer yet
Average opening age
57 days
Across 13 active openings
Workplace breakdown
Hiring countries
Top hiring cities
Most in-demand roles
- • Base Build PMO Executive, North Phoenix, AZ - Semiconductor
- • Director of Semiconductor Base Build, North Phoenix, AZ
- • Director of Semiconductor Tool Install
- • Electrical Construction Coordinator
- • Process Piping QA/QC Inspector
- • Project Administrative Coordinator
Frequently requested skills
As of November 17, 2026
Hiring insights calculated from active jobs tracked by LiftmyCV.
See how well you match this job
Log in or sign up and Eva will compare your profile with this role, explain your strengths and show what to improve.
Sign up to see your matchAlready have an account? Log inVisa sponsorship insights
Sponsorship not specified for this role
This job posting does not state whether visa sponsorship is available.
Employer H-1B filing history
World Wide Professional Solutions, LLC
2
certified
FY 2026
latest data
Based on U.S. Department of Labor LCA disclosure data. LCA certification is not the same as visa petition approval, and historical activity does not guarantee sponsorship for this role.
More at World Wide Professional Solutions
Similar jobs from this company
- Wastewater Construction Manager (Data Center Construction) – TexasWorld Wide Professional SolutionsVernon, USOn-site
- Electrical Construction CoordinatorWorld Wide Professional SolutionsPeoria, USOn-site
- Project Administrative CoordinatorWorld Wide Professional SolutionsVernon, USOn-site
- Site Logistics Project Manager, Vernon, TX - Data Center ConstructionWorld Wide Professional SolutionsVernon, USOn-site
- Regional Data Center Construction ExecutiveWorld Wide Professional SolutionsRemoteRemote
- Senior Project Manager, Mechanical LeadWorld Wide Professional SolutionsPeoria, USOn-site
Across the market
Similar jobs from other companies
- Wastewater Treatment Project ManagerTrilon GroupProvidence, USHybrid
- Water/Wastewater Treatment Project ManagerFreese and Nichols, Inc.Atlanta, USOn-site
- Water-Wastewater Treatment Project EngineerFreese and Nichols, Inc.Atlanta, USOn-site
- Wastewater Treatment OperatorAgropur Inc.United States Wisconsin Little ChuteOn-site
- Wastewater Treatment TechnicianpaeOCONUS-Antarctica-McMurdo StationOn-site
- Wastewater Treatment TechnicianAmentumAntarctica, USOn-site
Third-party content disclaimer
Full job descriptions are sourced directly from third-party applicant tracking systems (ATS), job boards, recruitment platforms, and employer career pages.
LiftmyCV does not claim ownership of this content or guarantee its accuracy or current availability. All original content is the intellectual property of the respective employers or other rights holders.
LiftmyCV hiring intelligence, availability checks, and related-job recommendations are generated from LiftmyCV data and public sources.
If you prefer, you may apply directly via the original listing for transparency.